Berry Hill Skatepark Update (July 2)

1 Comment

Hello friends!

I wanted to give you a little update on where things stand with the Berry Hill Skatepark project…

* WHERE WE ARE – Right now, city officials, Dreamland Skateparks, and F4SP are working to determine what actual phases we will be included in the park.  This involves some major donation “asks” (which potentially could get us the entire park!) as well as finalizing up any smaller donations (naming bricks) as well as investigating potential gift-in-kind opportunities exist from local construction companies.  At some point, probably in the next couple of weeks, this process will be concluded so that the official construction drawings can be completed and construction can begin.  At that point it gets a little harder to add a phase–so right now is a crucial point in the project!

As of right now, we are at just shy of $600,000 which would leave us a little short of phase one and two.  If things stand where they are, we likely would see a slightly trimmed phase one and two with most of the major elements included. I have a hard time imagining a phase one without phase two and I believe that everyone involved believes phase one and two will be included at a minimum.  So over the next couple of weeks all of this will get fine tuned.  Our hope is that a major donor will step up to match what we (The City and F4SP) have now!  If that happens… we get it all!  Let’s hope and pray that someone will rise to the occasion as this will likely be a once-in-a-lifetime opportunity for our community!

* WE STILL NEED YOUR HELP! – With that said, the number one thing that Friends for Skateparks can do is to acquire “bricks” for the park.  $450– You will become a part of history with a 4″ x 8″ commemorative brick that will be incorporated in Lexington’s next skatepark, featuring an inscription of your choice (3 lines; 14 characters per line). $900 – You will become a part of history with an 8″ x 8″ commemorative brick that will be incorporated in Lexington’s next skatepark featuring an inscription of your choice (4-6 lines; 14 characters per line).  DONATE NOW HERE!!!

*  INDIEGOGO CAMPAIGN CONCLUDES – We concluded our Indiegogo campaign and raised $4,471!!!  Thanks to all who supported the effort!  Your “perks” will be on their way soon!

* FINAL DESIGN! – here are the drafts…

BHSP_DRAFT_Final_Concept_Design_3D2__3_ BHSP_DRAFT_Final_Concept_Design_3D1__4_ BHSP_DRAFT_Final_Concept_Design__3_

Please share this update with as many as possible!

More coming soon…

Author: gduerson

Husband. Dad of 5. Simple Church Alliance Director. Skater. UK fan. Famous Rapper.

One thought on “Berry Hill Skatepark Update (July 2)

  1. Most recent post placed on July 2. Would like to have monthly posts/updates.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s